Effective from 27th June, 2017, RG-AP520-I(G2)  in oversea markets will be Pre-End of Sale (Pre-EoS). It is hereby announced that these products will be under sales control from this date. If you have any requirement, please contact with the product manager and the contract coordination specialist first. Otherwise, it can’t be guaranteed about the normal delivery.

 

1.     Pre-End of Sale Product

 Pre-EOS Product

Description


RG-AP520-I(G2)

Indoor Wireless Access Point, Dual-radio, Dual-band, X-Sense 3rd-Gen Smart Antenna, supports 802.11a/b/g/n/ac connections, 2x2 MIMO, FAT/FIT modes, Dual GE uplink copper port, supports PoE and local power supply (PoE and local power adapters need to be purchased separately).

 

2.     Pre-EOS Measures

No.

Key Factor

Description

Time Point

Measures

1

Formal end of sales (EOS)

The sales of the product will be formally ended and the product will be removed from the quotation list at that date (start date).

Dec. 31st, 2017

 

2

Stop new loan, start sort out the old loan

Stop the internal and external loan (start date).

July 7th, 2017

 

3

Complete sorting out old loan

All loaned devices will be return back before the specified date (end date).

July 27th, 2017

For the product that is not returned before the due date, the penalty is calculated as follows: Total penalty = Authorized price of salesman x  overdue days x X‰/day

4

Stop accepting requirement

Not accept the requirement in official flow (start date).

July 27th, 2017

 

 

3.     Replacement Model

Pre-EOS Product

Replacement

Description

Availability of Replacement

RG-AP520-I(G2)

RG-AP720-I

Indoor Wireless Wave2 Access Point, Dual-radio, Dual-band, X-Sense 4th-Gen Smart Antenna, two spatial streams, theoretical maximum speed is 1.267Gbps, supports 802.11a/b/g/n and 802.11ac connections work at the same time, MU-MIMO, FAT/FIT modes, Dual GE uplink copper port, BLE/Bluetooth iBeacon, supports PoE and local power supply (PoE and local power adapters need to be purchased separately).

Available for Ordering

Hereby notified

                                                                          International R&D Center

June 27th, 2017